
| 地(di)址: | 河北(běi)省泊頭(tou)老头猛地挺进❌她莹莹的体内视频🌈市道東(dong)街88号 |
| 電(diàn)話: | 0317-8185077 |
| 0317-8263980 | |
| 0317-8223128 | |
| 傳真(zhen): | 0317-8265584 |
| E-mail: | [email protected] |
| 地(di)址: | 河北(běi)省泊頭(tou)老头猛地挺进❌她莹莹的体内视频🌈市道東(dong)街88号 |
| 電(diàn)話: | 0317-8185077 |
| 0317-8263980 | |
| 0317-8223128 | |
| 傳真(zhen): | 0317-8265584 |
| E-mail: | [email protected] |
| KCB300齒輪(lún)泵流量(liang)18m3/h做潤滑(hua)油排油(you)泵助力(li)四川成(chéng)達 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 發布(bu)時間:2015-4-3 9:05:28 點(diǎn)擊次數(shù): | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
KCB300齒輪泵(beng)流量18m3/h,壓(ya)力0.36Mpa,吸入(rù)真空高(gāo)度3米,效(xiao)率42%,口徑(jing)70,電機功(gong)率7.5KW KCB300齒輪(lun)圖片:
KCB300整(zheng)機安裝(zhuāng)尺寸圖(tú)
KCB齒輪油(you)泵在輸(shu)油系統(tong)中可用(yòng)作傳輸(shu)、增壓泵(beng);KCB gear oil pump in the oil system can be used as a transport, booster pump; 在燃油(you)系統中(zhōng)可用作(zuò)輸送、加(jiā)壓、噴射(shè)的燃油(yóu)泵;In the fuel system can be used as a transport, pressure, jet fuel pump; 在一(yi)切工業(yè)領域中(zhōng),均可作(zuo)潤滑油(you)泵用。In all industrial areas, can be used as lubricating oil pump. KCB齒(chǐ)輪泵主(zhǔ)要有齒(chi)輪、軸、泵(bèng)體、安全(quán)閥、軸端(duan)密封所(suo)組成。齒(chi)輪經熱(re)處理有(you)較高的(de)硬度和(hé)強度,與(yǔ)軸一同(tóng)安裝在(zai)可更換(huàn)的軸套(tào)内運轉(zhuǎn)。泵内全(quan)部零件(jiàn)的潤滑(huá)均在泵(bèng)工作時(shí)利用🌈輸(shū)出介質(zhì)而自🌈動(dòng)達到。KCB gear pump are mainly gear, shaft, pump body, valve, shaft end seal. Gear after heat treatment with high hardness and strength, and shaft installed in the replaceable shaft sleeve. In all parts of the lubrication pump are pump work automatically to achieve using the output media. 泵(beng)内有設(she)計合理(lǐ)的洩油(you)和回油(you)槽,是齒(chǐ)輪在工(gong)作中承(chéng)受的扭(niǔ)矩力最(zuì)小,因此(ci)軸承負(fu)荷小,磨(mo)損小,泵(beng)效率高(gāo)。Pump is the drainage and back into the groove of reasonable design, is a gear in the work under the minimum torque force, so the bearing load is small, wear small, pump with high efficiency.
泵設有(yǒu)安全閥(fá)作為超(chāo)載保護(hù),安全閥(fa)的全回(hui)流壓力(lì)為⁉️泵額(e)定排除(chu)壓力的(de)1.5倍,也可(kě)在允許(xǔ)排出壓(ya)力範圍(wei)内根據(jù)實際需(xu)要另外(wài)調整。但(dàn)注⭕意本(běn)安全閥(fá)不能作(zuò)減壓閥(fá)的長期(qī)工作,需(xū)要時可(kě)在管路(lu)✉️上另行(háng)安裝。從(cong)主軸外(wài)伸端向(xiang)泵看,為(wéi)順時針(zhen)旋轉。Pump is equipped with safety valve as overload protection, the total reflux pressure relief valve is rated pump out pressure of 1.5 times, also can allow discharge pressure range according to actual needs and adjust. But note that this cannot be a long-term work pressure reducing valve, relief valve can be installed in the piping shall be separately when necessary. To pump from the main shaft overhang end to see, for clockwise. KCB齒(chǐ)輪泵安(an)裝順序(xu): KCB gear pump installation order:
1、在安裝(zhuang)過程中(zhōng),為防止(zhǐ)雜物落(luò)入機器(qì)内,機組(zu)的所👈有(you)孔眼🌈均(jun1)應蓋好(hǎo)。1, during the installation process, so as to prevent debris into the machine, all perforation should cover of the unit. 2、在接好(hao)管路及(jí)确定電(diàn)動機轉(zhuǎn)動方向(xiàng)後,再接(jiē)上聯☂️軸(zhou)器,并再(zai)校核一(yī)遍軸的(de)同心度(dù)。2, good on the line and determine the direction of motor rotation, and coupling is connected, check it again and shaft concentricity. 3、校正泵(bèng)軸和電(diàn)機軸的(de)同心度(du),在聯軸(zhou)大路外(wai)圓上,允(yǔn)許偏差(chà)0.1毫米;兩(liang)聯軸器(qì)平面的(de)間隙應(ying)保證2~4毫(hao)米,(小泵(bèng)取小值(zhi))間隙要(yao)均勻,允(yun)差0.3毫米(mǐ)。3, calibration of pump shaft and motor shaft concentricity, cylindrical, along the road in coupling allowable deviation of 0.1 mm;In the plane of the two coupling gap should guarantee 2 ~ 4 mm, small little pump (in value) clearance wants even, tolerance of 0.3 mm. 4、将機組(zu)放在埋(mái)有地腳(jiao)螺栓的(de)基礎上(shang),在底座(zuo)與基礎(chu)之間,用(yòng)成對的(de)楔墊用(yong)校正用(yòng)。4, put the unit in buried with anchor bolt, on the basis of between the base and foundation, with pairs of wedge cushion with correction. 5、為防止(zhǐ)管線中(zhong)雜物進(jin)入泵内(nèi),對新安(ān)裝的管(guan)線,在泵(bèng)膠應裝(zhuang)設過濾(lü)器,其有(yǒu)效截面(mian)應大于(yú)吸入管(guǎn)截🌍面的(de)2~3倍。5, in order to prevent debris into the pump in the pipeline, pipeline of new installation glue should be installed in the pump filters, the effective cross section should be greater than the suction pipe section 2 ~ 3 times. 6、松開(kāi)聯軸大(dà),用水平(ping)儀分别(bie)放在泵(bèng)軸和底(dǐ)座上,通(tōng)過調整(zheng)楔墊🏒,校(xiào)正機組(zu)水平,适(shì)當擰緊(jin)地腳螺(luo)栓,以防(fang)走動。6, loose coupling, use level on the pump shaft and base, respectively, by adjusting the wedge cushion, correction unit level, tighten the anchor bolts, just in case. 7、在(zai)機組實(shí)際試運(yun)行2~3小時(shí)後,作最(zui)後檢查(chá),如無不(bu)良現象(xiang),則認為(wéi)安裝合(he)格。 7, in the actual commissioning unit 2 ~ 3 hours later, a final inspection, if there is no negative phenomenon, is considered qualified installation.
|
›·